Client

Federal Republic of Germany represented by Autobahn GmbH in turn represented by DEGES Deutsche Einheit FernstraĂŸen-planungs- und-bau GmbH

Location

Lederhose, Germany

A9 Motorway

Improving road safety and connectivity for communities across Thuringia through a landmark 20-year motorway PPP.

The A9 in Thuringia is Germany's first motorway PPP delivered on an availability-payment basis - removing traffic risk from the private partner and aligning incentives around long-term road performance. Invesis and VINCI Concessions won the contract in 2011 to widen 19km and maintain 46.5km of motorway, completing construction on time in November 2014.

Financial Close

September 2011

Construction Period

2011 - 2014

Concession Period

20 years

Handback

2031

Client

Federal Republic of Germany represented by Autobahn GmbH in turn represented by DEGES Deutsche Einheit FernstraĂŸen-planungs- und-bau GmbH

Location

Lederhose, Germany

Sponsor/Investor

Invesis and VINCI Concessions

Consortium

Via Gateway ThĂ¼ringen GmbH @ Co KG (Invesis and VINCI Concessions)

Engineering Procurement and Construction

Wayss & Freytag Ingenieurbau, Eurovia

Operations and Maintenance

Via Gateway ThĂ¼ringen GmbH @ Co KG

Capital Value

€131m

Partnering with the German Federal Government to widen and modernise a congested motorway corridor in Thuringia

The A9 corridor in Thuringia had been under increasing pressure from heavy traffic volumes, with accident rates on the existing two-lane section a major concern for the Federal Ministry of Transport.

In 2011, the Federal Republic of Germany selected the Via Gateway Thuringen consortium - comprising Invesis (50%) and VINCI Concessions (50%) - under a 20-year DBFMO contract. The scope covered the widening of 19km from 2x2 to 2x3 lanes, construction of 24 new bridges and operation and maintenance of a total 46.5km corridor. Construction was completed on time in November 2014.

The A9 was Germany's first motorway PPP delivered under an availability-payment model - a significant milestone removing traffic volume risk from the private partner and aligning long-term commercial incentives with road quality and availability.

Germany's first availability-model motorway PPP - removing traffic risk from the private partner and aligning long-term incentives around road quality.
Sustainability

Protecting communities from noise and building for the long term on the A9 in Thuringia

  • 2,700m of noise barriers and 296m of noise walls were constructed along the route, bringing emissions to permissible limits and significantly reducing noise impact on residents and the natural environment.
  • The carriageway was built in concrete rather than asphalt, giving a calculated lifetime of 30 years - three times the 10-12 year lifespan of conventional asphalt - reducing resource consumption and maintenance requirements over the concession.
  • Intelligent LED lighting is installed at motorway facilities, saving energy and reducing light pollution in the surrounding environment.
  • Construction and maintenance waste is sorted and recycled or disposed of at specialist facilities in accordance with relevant regulations.
A 30-year concrete carriageway, 3km of noise barriers and LED lighting - building for the long term on Germany's first availability-model motorway.