{"id":1917,"date":"2017-12-15T00:00:00","date_gmt":"2017-12-15T00:00:00","guid":{"rendered":"https:\/\/invesis.localhost\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/"},"modified":"2023-06-22T12:57:05","modified_gmt":"2023-06-22T12:57:05","slug":"bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany","status":"publish","type":"post","link":"https:\/\/www.invesis.com\/fr\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/","title":{"rendered":"BAM wins PPP road project (Availability Model A10\/A24 Neuruppin to Pankow) in Germany"},"content":{"rendered":"<div class=\"node-content\">\n<p><a class=\"fancybox-image-link\" href=\"\/wp-content\/uploads\/drupal-backup\/news\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320.jpg\"><img decoding=\"async\" class=\"bam-base-image-style teaser-image image-style\" title=\"\" src=\"\/wp-content\/uploads\/drupal-backup\/news\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320.jpg?itok=3cRicHxl\" alt=\"\" \/><\/a><\/p>\n<p>Bunnik, The Netherlands, 15 December 2017 \u2013 The consortium consisting of BAM-PGGM and HABAU has been appointed preferred bidder for the Availability Model A10\/A24 AS Neuruppin to AD Pankow project in Germany by DEGES GmbH.<\/p>\n<p>&nbsp;<\/p>\n<p>This publicly-owned project management company is representing the Federal Republic of Germany. The A10\/A24 is the first of 11 projects of the so-called \u2018new generation\u2019 wave of infrastructure PPP projects that was launched by the Ministry of Transport in 2015. The project is located near the German capital, Berlin. Financial close is expected to be reached in February 2018.<\/p>\n<p>The design, build, finance, maintain and operate contract comprises the widening of the A10 to six lanes for a length of 29.6 km of motorway and the complete reconstruction of the A24 with four lanes plus an extended hard shoulder for a length of 29.2 km. In addition to the motorway, the construction scope of works also includes several bridges (27 replacement constructions, 10 new constructions, and two demolitions), noise protection walls, traffic sign bridges, traffic management installation, interchanges, rest areas and secondary\/agricultural roads.<\/p>\n<p>The construction activities will be carried out by BAM\u2019s German civil engineering company Wayss &amp; Freytag Ingenieurbau in cooperation with HABAU.<\/p>\n<p>The O&amp;M services scope (including winter maintenance) covers the entire contract section with a total length of approximately 64.2 km of motorway, including 51 bridges (37 new constructions and 14 existing). The O&amp;M works will be carried out by BAM PPP and HABAU.<\/p>\n<p>The construction period is approximately five years, and the overall project period is 30 years.<\/p>\n<p>The equity sponsors for the project are BAM PPP PGGM Infrastructure Co\u00f6peratie (70%) and HABAU (30%).<\/p>\n<p><strong><em>BAM PPP<\/em><\/strong><em> is responsible for Royal BAM Group\u2019s involvement in public-private partnership (PPP) projects. BAM PPP operates in five key European markets\u00a0(the Netherlands, Belgium, UK, Ireland, and Germany) and is exploring new markets in addition to broader project finance investment opportunities. BAM PPP\u2019s sector expertise includes roads, rail, education, health, justice, marine and general accommodation. BAM PPP has reached financial close on 46 projects, with a total capital value of over \u20ac7.2 billion. <\/em><\/p>\n<p><em>BAM PPP is an operating company of Royal BAM Group, a worldwide construction services company listed at Euronext Amsterdam.<\/em><\/p>\n<p>Further information:<\/p>\n<p><strong>BAM PPP<\/strong><\/p>\n<p>Vicki Harris, Marketing &amp; Communications Manager, +44 (0)141 779 8634<\/p>\n<p><strong>Royal BAM Group<\/strong><\/p>\n<p>Press: Arno Pronk, +31 (0)30 659 86 23<\/p>\n<p><strong>PGGM<\/strong><\/p>\n<p>Press: Maurice Wilbrink, +31 (0)30277 97 35<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Bunnik, The Netherlands, 15 December 2017 \u2013 The consortium consisting of BAM-PGGM and HABAU has been appointed preferred bidder for the Availability Model A10\/A24 AS Neuruppin to AD Pankow project &hellip; <a href=\"https:\/\/www.invesis.com\/fr\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/\">Continued<\/a><\/p>\n","protected":false},"author":2,"featured_media":1918,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[99],"class_list":["post-1917","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-news","sectors-roads","countries-germany"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BAM wins PPP road project (Availability Model A10\/A24 Neuruppin to Pankow) in Germany | Invesis<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BAM wins PPP road project (Availability Model A10\/A24 Neuruppin to Pankow) in Germany | Invesis\" \/>\n<meta property=\"og:description\" content=\"Bunnik, The Netherlands, 15 December 2017 \u2013 The consortium consisting of BAM-PGGM and HABAU has been appointed preferred bidder for the Availability Model A10\/A24 AS Neuruppin to AD Pankow project &hellip; Continued\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/\" \/>\n<meta property=\"og:site_name\" content=\"Invesis\" \/>\n<meta property=\"article:published_time\" content=\"2017-12-15T00:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-22T12:57:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.invesis.com\/wp-content\/uploads\/2022\/02\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"760\" \/>\n\t<meta property=\"og:image:height\" content=\"570\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"InvesisAdmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"InvesisAdmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/\"},\"author\":{\"name\":\"InvesisAdmin\",\"@id\":\"https:\\\/\\\/www.invesis.com\\\/#\\\/schema\\\/person\\\/298e4ecf5659338e37d0cf14eba2b77c\"},\"headline\":\"BAM wins PPP road project (Availability Model A10\\\/A24 Neuruppin to Pankow) in Germany\",\"datePublished\":\"2017-12-15T00:00:00+00:00\",\"dateModified\":\"2023-06-22T12:57:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/\"},\"wordCount\":393,\"image\":{\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.invesis.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg\",\"articleSection\":[\"Project News\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/\",\"url\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/\",\"name\":\"BAM wins PPP road project (Availability Model A10\\\/A24 Neuruppin to Pankow) in Germany | Invesis\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.invesis.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.invesis.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg\",\"datePublished\":\"2017-12-15T00:00:00+00:00\",\"dateModified\":\"2023-06-22T12:57:05+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.invesis.com\\\/#\\\/schema\\\/person\\\/298e4ecf5659338e37d0cf14eba2b77c\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.invesis.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.invesis.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg\",\"width\":760,\"height\":570},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.invesis.com\\\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.invesis.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BAM wins PPP road project (Availability Model A10\\\/A24 Neuruppin to Pankow) in Germany\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.invesis.com\\\/#website\",\"url\":\"https:\\\/\\\/www.invesis.com\\\/\",\"name\":\"Invesis\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.invesis.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.invesis.com\\\/#\\\/schema\\\/person\\\/298e4ecf5659338e37d0cf14eba2b77c\",\"name\":\"InvesisAdmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/75a839c3e3af891a1e7c767422088394ea6c89d649337228ad54cbd87dd5e922?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/75a839c3e3af891a1e7c767422088394ea6c89d649337228ad54cbd87dd5e922?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/75a839c3e3af891a1e7c767422088394ea6c89d649337228ad54cbd87dd5e922?s=96&d=mm&r=g\",\"caption\":\"InvesisAdmin\"},\"url\":\"https:\\\/\\\/www.invesis.com\\\/fr\\\/author\\\/invesisadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BAM wins PPP road project (Availability Model A10\/A24 Neuruppin to Pankow) in Germany | Invesis","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/","og_locale":"fr_FR","og_type":"article","og_title":"BAM wins PPP road project (Availability Model A10\/A24 Neuruppin to Pankow) in Germany | Invesis","og_description":"Bunnik, The Netherlands, 15 December 2017 \u2013 The consortium consisting of BAM-PGGM and HABAU has been appointed preferred bidder for the Availability Model A10\/A24 AS Neuruppin to AD Pankow project &hellip; Continued","og_url":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/","og_site_name":"Invesis","article_published_time":"2017-12-15T00:00:00+00:00","article_modified_time":"2023-06-22T12:57:05+00:00","og_image":[{"width":760,"height":570,"url":"https:\/\/www.invesis.com\/wp-content\/uploads\/2022\/02\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg","type":"image\/jpeg"}],"author":"InvesisAdmin","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"InvesisAdmin","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/#article","isPartOf":{"@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/"},"author":{"name":"InvesisAdmin","@id":"https:\/\/www.invesis.com\/#\/schema\/person\/298e4ecf5659338e37d0cf14eba2b77c"},"headline":"BAM wins PPP road project (Availability Model A10\/A24 Neuruppin to Pankow) in Germany","datePublished":"2017-12-15T00:00:00+00:00","dateModified":"2023-06-22T12:57:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/"},"wordCount":393,"image":{"@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/#primaryimage"},"thumbnailUrl":"https:\/\/www.invesis.com\/wp-content\/uploads\/2022\/02\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg","articleSection":["Project News"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/","url":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/","name":"BAM wins PPP road project (Availability Model A10\/A24 Neuruppin to Pankow) in Germany | Invesis","isPartOf":{"@id":"https:\/\/www.invesis.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/#primaryimage"},"image":{"@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/#primaryimage"},"thumbnailUrl":"https:\/\/www.invesis.com\/wp-content\/uploads\/2022\/02\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg","datePublished":"2017-12-15T00:00:00+00:00","dateModified":"2023-06-22T12:57:05+00:00","author":{"@id":"https:\/\/www.invesis.com\/#\/schema\/person\/298e4ecf5659338e37d0cf14eba2b77c"},"breadcrumb":{"@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/#primaryimage","url":"https:\/\/www.invesis.com\/wp-content\/uploads\/2022\/02\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg","contentUrl":"https:\/\/www.invesis.com\/wp-content\/uploads\/2022\/02\/default-teaser-image-9-606-1503551373933087517-761-15133345209961320-2.jpg","width":760,"height":570},{"@type":"BreadcrumbList","@id":"https:\/\/www.invesis.com\/bam-wins-ppp-road-project-availability-model-a10-a24-neuruppin-to-pankow-in-germany\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.invesis.com\/fr\/"},{"@type":"ListItem","position":2,"name":"BAM wins PPP road project (Availability Model A10\/A24 Neuruppin to Pankow) in Germany"}]},{"@type":"WebSite","@id":"https:\/\/www.invesis.com\/#website","url":"https:\/\/www.invesis.com\/","name":"Invesis","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.invesis.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/www.invesis.com\/#\/schema\/person\/298e4ecf5659338e37d0cf14eba2b77c","name":"InvesisAdmin","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/75a839c3e3af891a1e7c767422088394ea6c89d649337228ad54cbd87dd5e922?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/75a839c3e3af891a1e7c767422088394ea6c89d649337228ad54cbd87dd5e922?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/75a839c3e3af891a1e7c767422088394ea6c89d649337228ad54cbd87dd5e922?s=96&d=mm&r=g","caption":"InvesisAdmin"},"url":"https:\/\/www.invesis.com\/fr\/author\/invesisadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/posts\/1917","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/comments?post=1917"}],"version-history":[{"count":0,"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/posts\/1917\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/media\/1918"}],"wp:attachment":[{"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/media?parent=1917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.invesis.com\/fr\/wp-json\/wp\/v2\/categories?post=1917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}